Implemented Manufacturing Work In Progress
As far as I can see this is not currently available. I simply want to be able to assign raw materials, labour and other costs to a Job, and be able to see a total Job WIP amount on the Balance Sheet in Current Assets; and then go back to each Open Job and get a breakdown of what the costs are that make up the WIP for each job.
Hi Val, this link is not working to the video. Can you please repost?
We do create a work in progress transaction when components are allocated to production but production is not completed. Please check this video tutorial for more details: https://www.youtube.com/watch?v=sAMQSWQvwPU&list=PLkih4Eu6IIl7-Pvz0GbfJCDrK-oJeCDZH&index=28
bump!
WIP is the basic report the bank asks for here in the US/Canada when you credit line is a percentage of assets. This should be an easy one.
1 person likes this